How long does it take to get custom kitchen cabinets in Orlando? A clear, step‑by‑step project timeline

Custom kitchen cabinets in an Orlando kitchen — combining design and function


One of the first questions we hear from homeowners is a simple one: how long will my custom cabinets take? Knowing the typical timeline for custom kitchen cabinets in Orlando helps you plan demolition, work schedules, and daily life during a remodel. This guide walks you through every phase — from the first design meeting to the final install — so you know what to expect and why working with a local team like Orlando Custom Cabinets can keep your project on track.


Typical timeline for custom kitchen cabinets in Orlando

Most custom cabinet projects in Orlando take roughly 6–10 weeks from kickoff to completion. That range depends on project size, materials, and timing. Below we break the process into clear phases so you can see where time is spent and how to plan accordingly.

How long does each phase of the custom cabinet project take?

  1. Design Phase: About 1–3 weeks. This includes our consultations, site measurements, and design plans that reflect your needs.
  2. Manufacturing Phase: Typically 3–5 weeks after design approval. This is when your cabinets are built and finished in the shop.
  3. Installation Phase: Generally about 1 week, depending on layout complexity and how many pieces are being installed.

These three phases add up to the overall timeline. Understanding them helps you set realistic expectations and coordinate other parts of your remodel.

What factors influence the overall project duration?

Several common factors can push a project toward the longer or shorter end of the timeline:

  • Design complexity: Custom features, specialty drawers, or built‑ins take more time to plan and build.
  • Material availability: If a specific wood or finish is backordered, lead times increase.
  • Company workload: Peak seasons or a busy shop schedule can affect start dates and delivery.

Knowing these variables helps you make choices that align with your schedule.


What happens during the custom kitchen cabinet design phase?

Designer and homeowner reviewing custom cabinet plans during a consultation


The design phase sets the project up for success. It’s where we map out the layout, pick materials, and confirm how the cabinets will function in your space. Getting the details right here saves time and money later.

How long does the initial consultation and measurement take?

Initial consultation and field measurements are usually completed within about a week. During that visit we confirm dimensions, discuss storage goals, and capture any site conditions that affect the design.

What is the role of 3D renderings and client approvals?

3D renderings typically take a few days to a week to produce and are a huge help for visualizing the final layout. These visuals let you approve finish choices, cabinet styles, and hardware before anything is built. Approvals at this stage keep the project moving — late changes can add time.

Modern design tools and production software shorten planning and preparation time, so accurate digital layouts often speed projects from concept to shop.

How design software reduces preparation time

This research examined how computer software used for production preparation affects the time needed to create complete technical documentation when launching a new custom‑cabinet product in a small furniture factory. The study measured the time required for standard constructive preparation — drawing views, sections and details in AutoCAD from existing 3D models, then dimensioning parts and creating cutting schemes in suitable software — and compared it to preparation done with other specialized tools such as PolyBoard. The results show that appropriate computer software can significantly shorten the time needed for constructive preparation.


How long does the manufacturing and building phase last for custom cabinets?

After you approve the design, the build phase begins. This is where raw materials become finished cabinets. Lead time varies with the chosen materials and the shop’s schedule.

What materials are used and how do they affect lead times?

Your material choices influence both cost and timing. Common options include:

  • Plywood: Widely available and usually has shorter lead times.
  • Solid wood: Beautiful and durable, but certain species or custom milling can add time.
  • Laminate: Often faster to produce and install, though it offers a different look and feel than wood.

We’ll help you balance appearance, durability, and schedule when choosing materials.

How is quality control managed during manufacturing?

Quality checks happen throughout production — from rough assembly to final finish — to make sure joints, dimensions, and finishes meet our standards. These inspections add time but prevent costly rework and ensure a better final product.


What is the timeline for professional custom cabinet installation in Orlando?

Installer securing custom kitchen cabinets during a professional installation


Installation is the final and most visible stage. A careful install ensures your cabinets are square, secure, and ready for everyday use.

How long does site preparation and cabinet mounting take?

Site prep and mounting usually take about 3–5 days. This covers leveling, securing base and wall cabinets, and coordinating with electricians or plumbers if needed.

What are the final adjustments and finishing touches?

After the cabinets are in place, final adjustments and hardware installation typically add 1–2 days. We fine‑tune doors, align drawers, and complete any touch‑ups so everything looks and works as intended.


Which factors affect the duration of custom kitchen cabinet projects in Orlando?

Several practical factors influence timing; being aware of them helps you avoid surprises.

How do design complexity and project size impact timelines?

Larger kitchens or highly customized layouts naturally take more design, build, and install time. A straightforward kitchen with standard units is faster than a multi‑zone design with specialty storage.

What role does company workload and material availability play?

High demand at the shop or supplier backorders can extend lead times. We’ll give you an estimated start date and keep you updated if schedules shift.


Why choose Orlando Custom Cabinets for your custom kitchen cabinet timeline?

Working with a local, experienced team makes a measurable difference. We combine practical experience with local supplier relationships to help projects run on time and on budget.

How does local expertise ensure efficient project management?

With more than 35 years serving Central Florida, we know local codes, contractors, and suppliers — which helps prevent delays and keeps communication clear from start to finish.

What makes our integrated design-build-install process advantageous?

Our integrated approach gives you a single point of contact through design, fabrication, and install. That continuity reduces miscommunication and timelines, so your vision is delivered more precisely.

By understanding the phases and common delays, you can plan your remodel with confidence.

PhaseDurationKey Activities
Design1-3 weeksConsultations, measurements, 3D renderings
Manufacturing3-5 weeksShop build, finishing, quality checks
Installation1 weekSite prep, cabinet mounting, final adjustments


Knowing the typical timeline for custom kitchen cabinets in Orlando helps you schedule other trades, set realistic expectations, and avoid surprises. With clear communication and the right team, the process is straightforward and predictable.

Conclusion

Understanding the timeline for custom kitchen cabinets lets you plan smarter and keeps your remodel moving smoothly. From design through shop build and install, each step has its role — and partnering with a local expert like Orlando Custom Cabinets helps keep things on schedule. Ready to start? Contact us today and we’ll walk you through the timeline for your project.

Orlando Kitchen Cabinets Gallery

See the craftsmanship and attention to detail behind every Orlando Custom Cabinets kitchen project. Our gallery features real homes across Central Florida where we built custom cabinet solutions to fit each client's space and style. Look through our work and imagine what we can create for your kitchen.